5G deployment delays

USE
CASE

3

  • Slow cell sites and small cell rollouts
  • Radio and link issues
  • Back-and-forth between cell sites
  • Finger pointing

Challenge

Solution

FTB 5GPro with Automated 3-step process

  1. FIP to automatically detects dirty or damaged fiber connectors
  2. iOLM to automatically identify the location of fiber issues
  3. CPRI/eCPRI link validation to confirm proper operation of the radio
Font
Output device, Gadget
  • 5G done right. First time right!
  • More than 50% reduction on truck rolls
  • Enhanced network quality and reliability
  • Accelerated cell site rollouts

Results